Concrete formwork needs to do more than simply create the shape of a slab, wall or other concrete element. During a pour, the entire temporary formwork system must support the weight and pressure of wet concrete until the structure can safely support itself. LVL formwork plays an important role within this system, commonly used as joists and bearers beneath formply to provide support and transfer loads through to the props or shoring below.


Understanding where LVL sits within a formwork system makes it easier to understand why different LVL sections are used, how they work alongside formply and why the design of the supporting structure is so important. In this guide, we break down the role of LVL formwork from the formply down, including how joists, bearers and supporting components work together during concrete construction.

Where Does LVL Sit in a Concrete Formwork System?

When you look at a formed slab from above, most of the supporting structure is hidden. The formply creates the surface the concrete is poured onto, but underneath it is a temporary structure designed to carry those loads safely during construction. LVL formwork can form part of this supporting structure, typically as joists directly beneath the formply and as bearers supporting those joists.


The load path can be thought of from the top down: concrete → formply → joists → bearers → props or shoring → supporting structure. Each layer has a different job, and the size, spacing and arrangement of those components must follow the formwork design rather than being selected independently. SafeWork NSW specifically identifies formwork as a temporary structure that must safely support loads imposed during construction.

ATS Supplies the Products Required for a Concrete Formwork System

The Two Jobs of LVL Formwork: Joists and Bearers


Within a typical concrete formwork system, LVL is commonly used in two layers: joists and bearers. Although they may be made from the same type of engineered timber, they perform different jobs within the temporary structure.


LVL joists sit directly beneath the Formply, creating the first layer of support below the forming surface. They run at regular centres across the formwork system, supporting the Formply and transferring the loads imposed during the concrete pour to the bearers below.


LVL bearers sit beneath the joists and form the next layer of the support system. Rather than supporting the Formply directly, the bearers support multiple joists and transfer those loads down into the props or shoring.

ats formwork bearer
ATS formwork bearer example
ats formwork joist
ATS formwork joist example
example ATS formwork layout
ATS formwork layout example

Why Is LVL Used in Formwork?

01
Straight & Consistent
Uniform members help create a more consistent support layout beneath the Formply, particularly across larger slab areas.
02
Engineered Performance
Known structural properties allow LVL members to be incorporated into a formwork system designed around the required loads, spans and spacing.
03
Long Lengths & Multiple Sections
Different section sizes and available lengths give formwork designers flexibility when configuring joists, bearers and supporting members.

Choosing the Right Formwork LVL


Choosing Formwork LVL isn't simply a matter of selecting the largest section available. The joist and bearer sizes used within a formwork system need to suit the specific design, including the loads being supported, the distance between supports and the spacing of each member.


ATS Building Products supplies Formwork LVL E11 in 95x45, 95x65 and 150x75 sections, giving formworkers different options for joists, bearers and other supporting applications within a designed formwork system.


A 95x45 section, for example, shouldn't automatically be considered a "joist size", just as a 150x75 shouldn't automatically be considered a "bearer size". How each section is used depends on the formwork design and the loads it has been designed to carry.


For larger or more complex pours, the formwork layout may also change considerably across different parts of the same project. Member sizes, centres, spans and supporting systems should therefore be considered together rather than choosing LVL in isolation.

01 Loads

The weight and construction loads the temporary formwork system must support.

02 Span

The distance the LVL member needs to span between its supporting points.

03 Member Spacing

How closely joists, bearers and supporting components are positioned.

04 Role in the System

Whether the LVL is being used as a joist, bearer or another supporting member.

Formwork Design Determines

The Appropriate LVL Section

These factors are considered together when determining the LVL section, centres and layout required for the formwork system.

95 × 45
95 × 65
150 × 75
ATS Formwork LVL E11 is available in multiple sections. The appropriate section and configuration should follow the project's formwork design and engineering requirements.

Summary


LVL formwork forms part of the temporary structure that supports concrete during construction. Within a typical slab formwork system, LVL joists support the Formply, while LVL bearers sit beneath the joists and transfer loads through to the props or shoring below.


Using engineered LVL gives formworkers straight, consistent members that can be incorporated into a designed support system across the pour. However, the section size, spacing and span of the LVL all need to work together as part of the overall formwork design.


ATS Building Products supplies Formwork LVL E11 in 95x45, 95x65 and 150x75 sections, alongside Formply and other formwork products required across concrete construction projects.

Frequently Asked Questions

What is LVL formwork used for?

LVL formwork is commonly used as joists and bearers within temporary concrete formwork systems. These members sit beneath the Formply and help transfer loads through the support structure during a concrete pour.

What is the difference between Formwork LVL and Formply?

Formply forms the surface that the concrete is poured against, while Formwork LVL is used underneath the Formply as part of the supporting structure. In a typical slab system, the Formply is supported by LVL joists, which are then supported by LVL bearers.

Can LVL formwork be used as both joists and bearers?

Yes. LVL can be used in either role depending on the formwork design. The section size, spacing and span required will depend on the loads being supported and how the temporary structure has been designed.

What size LVL is used for concrete formwork?

There is no single LVL size that suits every formwork system. ATS Building Products supplies Formwork LVL E11 in 95x45, 95x65 and 150x75 sections, with the appropriate size determined by factors such as load, span, member spacing and the role of the LVL within the system.


Does ATS Building Products supply complete concrete formwork products?

Yes. ATS Building Products supplies Formwork LVL E11, Formply, Edge Form LVL and other formwork products used across residential, commercial and civil concrete construction projects.

Further Reading

Next article Framing Timber Explained: Everything You Need to Know